The Industrial Park fully promotes the construction of distributed photovoltaic projects

2022-04-20 09:50
29

Recently, the cadres of the Industrial Park Economic Development Bureau went to Aitejia, Jinhui, Panshou and other enterprises to publicize and guide the installation of photovoltaic projects on rooftops and related policies, and analyzed and understood the power consumption needs of enterprises and the available area of roofs, so as to achieve high-quality industrial plants. Resource sites should be built as much as possible.


It is reported that as of now, nine enterprises in the park have completed the filing of photovoltaic projects, and one of them has achieved photovoltaic installation and grid-connected power generation, with a total installed capacity of 3272.96 kilowatts and an estimated annual power generation of 3.6002 million kWh.


Next, the industrial park will visit frequently, feel the situation of enterprises, mobilize widely, strengthen the connection with enterprises, accelerate the construction of distributed photovoltaic projects in the park, and accumulate energy for the high-quality green development of enterprises.